Data Centre Insurance in Ontario

Data Centre Insurance in Ontario

Insurance for Ontario data centre owners, colocation operators, tenants and builders. We build each program around uptime: property, equipment breakdown, business interruption, cyber and builder's risk, shopped across all the major markets.

What a Data Centre Insurance Program Covers

Property for critical infrastructure

Property for critical infrastructure

Covers the building, the mechanical and electrical plant and the IT hardware against fire, water, wind and theft. We set limits from a current replacement cost valuation, because generators, switchgear and chillers come with long lead times and rising prices.

Equipment breakdown

Equipment breakdown

Pays for sudden mechanical and electrical failure of chillers, CRAC units, UPS systems, switchgear, transformers and generators. A standard property policy excludes these losses, which is why equipment breakdown sits at the centre of every data centre program we build.

Business interruption and extra expense

Business interruption and extra expense

Replaces income lost while you are down and pays the extra cost of staying online, such as rental generators, temporary cooling and rush freight on parts. Switchgear and transformers can take a year or longer to replace, so we set the indemnity period from your real lead times.

Cyber and technology E&O

Cyber and technology E&O

Cyber responds to breaches, ransomware and network outages. Technology E&O responds when a customer claims your service failed them. Colocation and hosting providers usually need both, and we check the wordings against what your service level agreements promise.

Who We Insure in the Data Centre Sector

01
Data centre owners and operators

Data centre owners and operators

Enterprise, wholesale and edge facilities. We insure the building, the mechanical and electrical plant and the revenue that depends on them, so one event does not leave you repairing equipment out of pocket while customers wait.

02
Colocation and hosting providers

Colocation and hosting providers

Your customers' equipment sits in your halls and your contracts promise uptime. We line up property, equipment breakdown, technology E&O and cyber so a single outage does not fall between policies.

03
Colocation tenants and in-house server rooms

Colocation tenants and in-house server rooms

The provider's policy protects the provider. Your servers, your data and your lost income need their own coverage, including when the equipment sits at an address you do not control.

04
Developers, contractors and engineers

Developers, contractors and engineers

Builder's risk with testing and commissioning cover, wrap-up liability, delay in start-up and professional liability for the firms that design and build Ontario data centres.

Insurance built around uptime.

Tell us how your facility runs

We start with a conversation about your power, your cooling and your contracts. Then we shop all the major markets, including Lloyd's of London, and come back with options explained in plain language.

What Underwriters Ask Before Quoting a Data Centre

01
How much redundancy is built in

How much redundancy is built in

N, N+1 or 2N on power and cooling, and whether the design has been certified or independently reviewed. More redundancy usually means a shorter worst-case outage, and that is what an underwriter is pricing.

02
How fire is detected and suppressed

How fire is detected and suppressed

Very early smoke detection, pre-action sprinklers or clean agent systems, and how battery rooms are separated from the data halls. In Allianz's 2026 review of data centre claims, fire made up well over half of the losses by value and water damage was the most frequent cause, so expect detailed questions on both.

03
How power and cooling are maintained

How power and cooling are maintained

Generator load testing, fuel supply, UPS battery type and service history, infrared scans of electrical gear and who holds the maintenance contracts. Good records are one of the least expensive ways to improve your terms.

04
What your contracts promise

What your contracts promise

Service level agreements, liability caps, customer equipment in your care and waivers of subrogation. Insurance should match what you have signed, so send the contracts with the submission.

Equipment Breakdown Coverage for Data Centres, Explained

In the Uptime Institute's 2026 outage analysis, power problems caused 45% of the significant outages operators reported, most often a UPS, transfer switch or generator failure. Equipment breakdown is the coverage built for that, so it is where we start.

Cooling plant

Cooling plant

Hover to flip

Cooling plant

A seized compressor or failed pump can overheat a data hall quickly. Equipment breakdown pays to repair or replace the unit and, with the right extensions, for temporary cooling while parts arrive.

Hover away to flip back
Power train

Power train

Hover to flip

Power train

Most property policies exclude electrical arcing and short circuits unless a fire follows. Equipment breakdown covers them, including damage from operator error.

Hover away to flip back
Income and extra expense

Income and extra expense

Hover to flip

Income and extra expense

Business interruption replaces income lost while you are offline. Extra expense pays for rental generators, overtime and air freight on parts. Check the waiting period before cover starts.

Hover away to flip back
Utility and service interruption

Utility and service interruption

Hover to flip

Utility and service interruption

Responds when equipment failure at your power, water or telecom supplier takes you down with no damage on your site. Some wordings include a landlord's equipment, useful in a colocation hall.